A headquarters lobby has about four seconds to say who a company is. For a Shanghai technology group, that sentence had to be spoken in steel. Meridian Apex is the abstract sculpture we designed and fabricated for their reception hall — a single brushed stainless steel form derived from the company’s own mark and installed before the building opened.
1. Project Background
The commission came through the architecture firm delivering the headquarters fit-out, not directly from the client. That is the normal route for corporate lobby art: the architect controls the palette and the sightlines, and the sculpture has to sit inside a design intent that was fixed months earlier.
The brief was unusually specific. The company wanted a piece that expressed growth and rising data — an abstract metal sculpture that read as upward movement without resorting to arrows, graphs or literal circuitry. It had to be visible from the street through the curtain wall, safe in a space with heavy foot traffic, and cleanable by the building’s existing facilities team using nothing more exotic than a microfibre cloth.
We were engaged at concept stage, which gave us the chance to influence the structural decision before the lobby’s finishes were locked. Working through the architecture firm also meant our drawings went straight into their coordination model, so the anchor points, power for the accent lighting and the floor loading were resolved alongside everything else.
2. Design & Craftsmanship
The abstract form began with brand-to-3D translation. The company’s logo is a stepped chevron; we extracted its underlying geometry and rotated it through a rising vertical axis to produce a twisting, faceted column that reads as a solid mass from the entrance and as a series of thin blades from the side.
Finishes were the main design argument. Mirror-polished stainless steel would have been spectacular but wrong for this atrium: it reflects every passer-by, shows fingerprints and dust immediately, and in a glass-walled lobby it doubles the daylight and creates glare. We specified a brushed, hairline finish and demonstrated both samples under the actual lobby lighting. The hairline grain softens reflections, hides handling marks, and gives the edges a crisp highlight that a mirror surface loses.
The form stands 3.0m (H) x 1.2m (W) x 0.9m (D). We weighed a wall-mounted relief against a free-standing piece and recommended free-standing. A wall-mount of this height would have concentrated load into the curtain-wall mullions, and it would have been read as flat decoration from the reception desk. Standing proud of the wall, the sculpture can be walked around and becomes a meeting point — which is exactly what a reception signature should be.
3. Manufacturing Process
The body is fabricated from 304 stainless steel — the correct grade for an interior with cleaning chemicals and Shanghai’s humidity, where 316 would be an unnecessary cost. The faceted panels were cut from 3mm and 4mm plate, formed with a press brake to controlled radii, and welded into a single shell over an internal steel chassis.
Welding stainless steel at this scale is a distortion problem more than a joining problem. We tacked, sequenced and back-stepped every seam, then let the assembly rest before final alignment. All welds were ground back flush and the entire surface was taken through a graded abrasion sequence ending in a fine hairline grain, applied in one continuous direction so the light reads consistently from every angle.
Inside, a bolted steel spine runs the full height and bolts to a base plate. That spine carries the wind and impact loads of a public lobby and keeps the outer skin in tension-free geometry. A removable lower panel gives access to the anchor bolts and to the low-voltage accent lighting at the base, with no visible fasteners on the sculpture itself.
4. Delivery & Installation
The piece travelled in three sections to fit the building’s service lift, wrapped in protective film and crated on custom cradles. Installation ran out of hours so the lobby remained usable, and was completed in two nights.
Night one: base plate set and grouted, spine erected and levelled against the lobby datum. Night two: skins lifted, aligned, and mechanically joined; all seams dressed; final grain matching completed by hand; protection removed and the surface washed down. A laser check confirmed verticality and a pull test on the anchors satisfied the main contractor’s sign-off.
We then walked the facilities team through the care regime — dry microfibre in the direction of the grain, neutral pH cleaner only, no abrasive pads and no chlorinated products. That single briefing prevents the most common cause of damaged stainless steel sculpture in commercial interiors.
5. Outcome
Meridian Apex was installed three weeks before the building’s opening event and has become the default backdrop for every visitor photograph and press shot taken there. The client’s own leadership team now uses the sculpture as a wayfinding reference — “meet at the apex” — which is the clearest evidence that a piece has been absorbed into a company’s daily language.
For corporate buyers the takeaway is straightforward: lobby art succeeds when it is commissioned as part of the building rather than added afterwards. Getting the finish, the structure and the lighting resolved at fit-out stage cost less than correcting them would have, and it is the reason the piece still looks new after a full year of daily traffic.
Our guide to commercial sculpture for retail, offices and urban plazas covers the wider procurement picture, and our material comparison guide explains when stainless steel beats bronze or fibre-reinforced plastic.
- Client: Technology company headquarters
- Location: Shanghai, China
- Dimensions: 3.0m (H) x 1.2m (W) x 0.9m (D)
- Material: Brushed (hairline) 304 stainless steel
- Construction: 3-4mm formed plate over bolted internal steel spine
- Finish: Continuous-direction hairline grain, hand-matched at joins
- Installation: Free-standing, anchored to lobby base plate
- Timeline: 19 weeks from concept to installation
- Budget: $12,400 USD